Problem in residue fluid catalytic cracking system resolved at Dung Quat oil refinery

26-Oct-09
A problem at Dung Quat oil refinery’s residue fluid catalytic cracking system has been resolved. Capacity is being raised from 65% to 100%. Operations have resumed at the beginning of the month after 20 days, and a shipment of 5,500 tons of propylene has been dispatched to Japan. At present, 13 out of its 14 technical workshops are operating in a stable condition, turning out eight commercial products. The remaining one, which treats sulphur, will be operated in the next few days.
  More News  Post Your Comment

Previous News

Next News

{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
Lemo machine for bags on roll

Lemo machine for bags on roll