Zhongtian Synergetic to startup 350,000 tpa PP production

19-Oct-16

Zhongtian Synergetic has gone through all the processes of its newly built 350000 tpa polypropylene plant, and scheduled to start production of homo PP raffia T30S in the coming week (Oct 24-30), as per sources reported by www.ccfgroup.com.
Zhongtian Synergetic may also startup its 300000 tpta LLDPE plant in Oct, but the news is not yet confirmed by the company side. The new coal-based petrochemical complex is located in Ordos, Inner Mongolia, on October 20, including a 120kta low density polyethylene (LDPE) plant, a 250000 tpa pipe grade LDPE unit, a 300000 tpa linear low density polyethylene (LLDPE) unit and two 350000 tpa polypropylene plants. The olefins will be sourced from Zhongtian Synergetic’s methanol, based on coal-chemical technology. 

Zhongtian Synergetic Energy is a joint venture between Sinopec (38.75%), China Coal Group (38.75%), Shenergy Group Co., Ltd. (12.5%), and Inner Mongolia Manshi Coal Group 

  More News  Post Your Comment

Previous News

Next News

{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
Unused tiffin, lunch box moulds

Unused tiffin, lunch box moulds