Mitsui Chemicals is to shut its 612,000 tpa naphtha cracker in Chiba for two weeks in October to fix an unspecified problem, as per Reuters.
The problem does not need an immediate fix and the work will be conducted at the same time as the maintenance of some downstream units that process products from the naphtha cracker, a company spokesman said.
{{comment.DateTimeStampDisplay}}
{{comment.Comments}}