An ethylene-polyethylene plant belonging to SOCAR’s Azerikimya PU will be stopped for overhaul in August, Director of the Plant Ogtay Niftaliyev said, as per azernews.az. The ground-breaking research and works at the plant within the modernization of enterprises of the Azerikimya PU are practically completed, according to him.
"The first stage of the installation of automated control systems should be completed by August-September, after which a number of new facilities are planned to be built," Niftaliyev said. "The main goal of the overhaul, which covers a period of 3 years, is to increase the efficiency and production capacity of ethylene and polyethylene plant in order to supply SOCAR Polymer with 150,000 tons of propylene a year. Polyethylene production will rich 105,000 tpa and this year we are proceeding according to the production schedule. I am sure that the plan will be fulfilled,” the director concluded.
Azerikimya has an ethylene-polyethylene plant, a surfactants plant, an organic synthesis plant, a machinery maintenance plant, a chemical engineering institute, a repair and construction division, a transportation and special equipment division, and a storage facility.
Previous News
Next News
{{comment.DateTimeStampDisplay}}
{{comment.Comments}}