Start up of ethylene cracker JV between OxyChem and Mexichem scheduled for Q1-2017
18-Dec-14
Construction is underway of a new 1.2 bln lb/yr ethylene cracker at Ingleside, Texas. The cracker, a joint venture between Occidental Chemical and Mexichem is on schedule for operations in Q1-2017. Construction of the facility commenced in Q2-2014.
{{comment.DateTimeStampDisplay}}
{{comment.Comments}}