Technical Papers Plastics
An application of Plastics in Housing- Part II

An application of Plastics in Housing- Part II

13-Oct-01
Techno - commercial information on plastics Industry - News on Plastics Industry - Plastemart.com
 
<% An application of Plastics in Housing- Part II
An application of Plastics in Housing- Part II  
 

Building methods report card

**** - Excellent   *** - Good   ** - Satisfactory   * - Poor

Performance Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
Volatile Organic Compound (VOC)

(Off-gassing)
** ** * <0.3mg/m3

***
Interior Air Quality (IAQ) ** ** * ****
Energy Performance(4)

(air tightness and thermal mass)
** ** * ****
Self-ignition temperature

(ASTM - D1929 )
** ** * 480� C/896� F

***
Flame Spread

(ASTM E84)
*** *** * 19

****
Smoke Development and Toxicity

(ASTM E84)
** ** ** 261

****

(4) Air Leakage is responsible for between 30%-40% of all cooling costs.

Design Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
ISO 9001 Ceritfied No No No Yes
Design flexibility(walls) ** *** **** ****
Design flexibility (roof) *** *** *** **
Insulated Cathedral Roof No No No Yes
Roof Steel / Aluminium Reinforced No No No Yes
Interior / Exterior Wall Construction Concrete/Wood Block/Wood Wood/Wood Concrete/
Concrete
Interior/Exterior Cladding Required ? Yes Yes Yes No
Drywall Required Yes Yes Yes No
Ability to integrate with other building technologies/Methods Yes Yes Yes Yes
Multi-Level Construction Yes Yes No Yes
Residential/Commercial/
Industrial Applications
Yes Yes No Yes
Overall Building Strength *** *** * ****

Maintenance Formed/Poured Concrete Block Construction Wood  Construction Plastics Construction
Painting and Staining Required Yes Yes Always Never
Potential for Termites  Yes Yes Yes None
Resistance to Deterioration due to Vermin Infestation *** *** * ****
Waterproof No No No Yes
Mold & Mildew Resistance *** ** * ****
Rust and Rot Resistance *** ** * ****
Resistance to Hurricanes *** ** * ****
Resistance to Flood/Water Damage ** ** * ****
Overall Maintenance *** ** * ****

Overall Costs Formed/Poured Concrete Block Construction Wood Construction Plastics Construction
Cost to Design *** *** ** ***
Cost of Construction

(including soft costs)
** *** ** ***
Cost to Maintain ** ** * ****
Time to Build 6-9 months 6-9 months 4-5 months 2-3 months
Insurance Premiums # *** ** * ****
Overall Cost ** *** * ****

(#) Having withstood hurricane force winds with gusts up to 236mph and earthquakes up to 7.9 in the Richter Scale.

{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

*
Lemo machine for bags on roll

Lemo machine for bags on roll