Dow to conduct planned maintenance turnaround at propylene oxide plant in Texas

28-Mar-08
The Dow Chemical Company (Dow) will conduct a scheduled turnaround at its propylene oxide (PO) production plant in Freeport, Texas. The 2-3 week turnaround, scheduled to begin on March 27, 2008, will involve equipment inspections and, if necessary, repairs and replacements. ,PO is used as a chemical intermediate in the production of urethane polyether polyols, glycol ethers, surfactants and other chemical intermediates, as well as propylene glycol (PG). Based on publicly available data, Dow anticipates that global demand for PO will grow at 3 to 4 percent annually through 2010, in line with the world Gross Domestic Product.
  More News  Post Your Comment
{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
 Kautex KB15 blow moulding Machine

Kautex KB15 blow moulding Machine