KBR awarded pre-FEED contract by Egypt Hydrocarbon Corporation (EHC) for PE units

24-Nov-08
KBR has been awarded a contract by Egypt Hydrocarbon Corporation (EHC) to complete a pre-Front End Engineering Design (pre-FEED) study for two polyethylene units at its proposed Petrochemical Complex. The complex will be located 25 km (15.5 miles) from Suez, Egypt, near the Red Sea. Under the pre-FEED study, KBR will perform Polyethylene (PE) technology evaluation and licensor recommendation to EHC. Each plant has a nominal capacity of 450,000 tpa of HDPE and LLDPE.
  More News  Post Your Comment

Previous News

Next News

{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Name Required.

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
Large capacity chemical storage tanks

Large capacity chemical storage tanks

news-plastics-information