Saudi Aramco is considering integration of its petrochemicals production with the Ras Tanura refinery and Ju'aymah Industrial Area feedstock, at an estimated cost of US$6 bln. The proposed integration would include a large ethane/naphtha based cracker, an aromatics recovery complex and complementary downstream derivative units to produce petrochemicals. he Ras Tanura refinery consists of a 325,000 bpd hydrocracker and a 200,000 bpd condensate splitter.
{{comment.DateTimeStampDisplay}}
{{comment.Comments}}