IOCL announces PP and PE prices w.e.f. 11th May 2023.

PP grade prices have been left unchanged.

HDPE Yarn/Raffia & Injection Moulding grade prices down adjusted by INR 2,000/MT.
HDPE BM grade prices are reduced by INR 1500/MT
HDPE Film/all HDPE Pipe grade prices have been reduced by INR 1,000/MT.

LLDPE Extrusion Coating grade prices are reduced by INR 5,000/MT
LLDPE grade prices have been revised lower by INR 3,000/MT.

Price protection announced in PE with effect from May 11th to June 1st 2023 or the next price change whichever is earlier.

Price protection excludes deemed export, contractual and export sales

Calender 11-May-23
share icon

OPaL announces PP and PE prices w.e.f. 11th May 2023.

PP grade prices are left unchanged.

HDPE Raffia/Injection Moulding grade prices down adjusted by INR 2,000/MT.
HDPE BM grade prices are reduced by INR 1500/MT.
HDPE Film/Pipe grade prices have been reduced by INR 1,000/MT.

LLDPE Extrusion grade prices are reduced by INR 5,000/MT.
LLDPE grade prices have been revised lower by INR 3,000/MT.

Price protection announced in HDPE and LLDPE with effect from May 11th to May 31st, 2023, or the next price change, whichever is earlier

Calender 11-May-23
share icon

MRPL PP prices rolled over w.e.f. 11th May 2023

Calender 11-May-23
share icon

RIL rolled over PP prices w.e.f. 11th May 2023.

Calender 10-May-23
share icon

RIL PE prices are being revised downwards w.e.f. 11th May 2023

HD Raff / IM by INR 2,000/MT.
Blow molding by INR 1,500/MT.
HD Film/Pipe by INR 1,000/MT.

LL Extrusion by INR 5,000/MT.
All other LLDPE by INR 3,000/MT.

LDPE Extrusion down by INR 2,000/MT.
All other LDPE by INR 3,000/MT.

Price Protection from 11th May to 1st June or next price change whichever is earlier.

Calender 10-May-23
share icon

ASPET/RAMAPET price reduced by INR 4,000/MT in basic w.e.f. 9th May 2023.

Calender 09-May-23
share icon

HMEL PP Prices w.e.f. 8th May 2023.

There is a decrease in the Basic prices of all PP grades by INR 1,500/MT.
There is a revision in Ex-Depot prices.
There is a revision in Locational Adjustments.

Calender 08-May-23
share icon

Supreme Petrochemical announced Price Protection in PS till 31st May 2023 or next Price revision whichever is earlier w.e.f. 8th May 2023.

Calender 08-May-23
share icon

RIL reduced PET Prices by INR 4,000/MT w.e.f. 9th May 2023.

Calender 08-May-23
share icon

RIL announced the XYZ Incentive scheme in PP for the month of May 2023.

The slabs will be as following:
8.33% to 10% as Rs. X
10% to 12% as Rs. Y
12% > as Rs. Z

The amount will be declared by the month end.

Calender 05-May-23
share icon

RIL announced performance scheme in PE for this month. The scheme will be XYZ scheme. The slabs will be >8%-<10%, >10%-<12%, > 12%. All prime and non prime grades will be included for the scheme. Utility grades won't be part of the scheme but will get 1st slab discount in addition to grade specific discount. Deemed exports qty will be considered for eligibility purpose.

Calender 04-May-23
share icon

RIL rolled over PET Prices w.e.f. 1st May 2023.

Calender 01-May-23
share icon

RIL PVC prices have been reduced by INR 4,000/MT for all grades w.e.f. 1st May 2023 Price protection withdrawn

Calender 30-Apr-23
share icon

Supreme Petrochem reduces GPPS grade prices by INR 1.50/MT HIPS grade prices are down by INR 2.50/MT w.e.f. 29th April 2023.

Calender 29-Apr-23
share icon

IOCL Polymer Price Revision w.e.f. 27th April 2023.

PP: Price Rollover
PE: Price Rollover

Calender 27-Apr-23
share icon

RIL will have price protection in PVC w.e.f. 24th April till 1st May 2023.

Calender 24-Apr-23
share icon

RIL announces an incentive scheme in LDPE for the month of April, 2023 based on the average lifting for the months from October 2022 to March 2023 excluding zero lifting months as follows:
IF Lifting % is LDPE
>= 90% to <100% INR 1.25/MT
>= 100% to <110% INR 2,000/MT
>= 110% INR 3,000/MT

Calender 21-Apr-23
share icon

RIL has announces an Incentive Scheme in PP for the Month of April, 2023 as follows:
>=4 <8.33% as INR 2,000/MT
>=8.33 <10% as INR 3,000/MT
>=10% and Above as INR 4,000/MT

The scheme is based on an MOU signed in the current year of 2023-2024.

Calender 21-Apr-23
share icon

ASPET/RAMAPET price increased by INR 1,000/MT in basic w.e.f.18th April 2023.

Calender 17-Apr-23
share icon

RIL rolled over PVC Prices w.e.f. 13th April 2023.

Calender 13-Apr-23
share icon
Windmoller  and Holscher 5 layer cast film line

Windmoller and Holscher 5 layer cast film line