CB&I awarded US$115 mln EPC contract by Ingleside's ethylene storage facility in Texas

01-Jul-15
CB&I has been awarded a contract valued at approximately $115 million, as part of the scope of the ethylene project, by Ingleside Ethylene LLC, a joint venture between Mexichem, S.A.B. de C.V. (Mexichem) and Occidental Chemical Corporation (OxyChem), a subsidiary of Occidental Petroleum Corporation, for the engineering, procurement and construction of an ethylene storage facility in Markham, Texas. The scope of work consists of the surface facilities - including compression, dehydration, metering and associated pipe fabrication-at the salt cavern storage location. The storage facility is integral with the ethylene cracker where as previously announced, CB&I is providing the license for the ethylene technology, five SRT® (short residence time) cracking heaters and the engineering, procurement and construction of the ethylene cracker in Ingleside, Texas. "The ethylene cracker is a significant project both for OxyChem and Mexichem, and the award of this project reflects the quality of work CB&I has provided to date," said Patrick K. Mullen, President of CB&I's Engineering & Construction operating group. "It shows the customers' confidence in CB&I's ability to offer a more complete supply chain solution—from proven licensed process technology, fabrication and engineered products, all the way through to the EPC process."
  More News  Post Your Comment

Previous News

Next News

{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
Moulds for lotion pump

Moulds for lotion pump