Formosa Petrochemical plans to shut two secondary units of its Mailiao refinery for 2-4 weeks of maintenance in October 2013. It will conduct maintenance checks at an 80,000 bpd vacuum distillation unit or VDU, and a 84,000 bpd residual fluid catalytic cracking unit or RFCC. The 540,000 bpd Mailiao refinery complex has a total of three crude distillation units, one VDU and two RFCCs.
{{comment.DateTimeStampDisplay}}
{{comment.Comments}}