Foster Wheeler awarded FEED contract for ExxonMobil Chemical Complex in Singapore

08-Aug-06
Foster Wheeler Ltd. has been authorized by ExxonMobil Asia Pacific Pte. Ltd. to proceed with the early phase of the front-end engineering design (FEED) for certain downstream units and associated plant infrastructure of the Singapore Parallel Train (SPT) project. The possible new complex currently under study by Foster Wheeler, includes an ethylene cracker and downstream plants for the production of ethylene and propylene derivatives. The Foster Wheeler team has been authorized, under its contract, to undertake the FEED of selected process units and the overall SPT project infrastructure.
  More News  Post Your Comment
{{comment.Name}} made a post.
{{comment.DateTimeStampDisplay}}

{{comment.Comments}}

COMMENTS

0

There are no comments to display. Be the first one to comment!

*

Email Id Required.

Email Id Not Valid.

*

Mobile Required.

*

Name Required.

*

Please enter Company Name.

*

Please Select Country.

Email ID and Mobile Number are kept private and will not be shown publicly.
*

Message Required.

Click to Change image  Refresh Captcha
Moulds for lotion pump

Moulds for lotion pump